We preliminary present some technical data of Vel'ky traverz (the Great Traverse).
| lenght of free rope in air | 847.67 m |
| horizontal projection of free rope | 846.76 m |
| elevation of the anchorage points | 39.23 m |
| height of lower anchorage above gorge bottom | 342 m |
| weight of air part of rope | about 80 kg |
| tension of unloaded rope | 6.2 kN |
| sag of unloaded rope | 7 m |
| tension of loaded rope | upto 7 kN |
| sag of loaded rope | about 30 m |
| diameter | 12 mm |
| lenght | 909 m |
| material | Polyamid |
| weight | 100 kg/km |
| strengh | 30 kN |
| elongation | 10 % for 10kN |
| producer | LANEX Bolatice |
| 19. 8. | 19:00 | the rigging started |
| 21. 8. | 14:00 | the rigging finished |
| 22. 8. | 10:30 | the traverse was inaugurated |
| 22. 8. | 12:00 | the first creeper passed |
| 22. 8. | 13:00 | the official creeper passed |
| 23. 8. | 15:00 | the rescue was simulated |
| 23. 8. | 19:30 | the parachutist jumped |
| 25. 8. | 12:00 | the passing ended |
| 25. 8. | 16:00 | the derigging finished |
| 25. 8. | 20:00 | the champagne was drunk |
| Slovakia | Czechia | Hungary | Germany | Great Britain | Russia | |
| 31 | 9 | 4 | 1 | 1 | 1 |
|---|