Preliminary programme
Expected contributions from Overall status and HEC part (P.Schacht)
EMEC (CH.Benchouk, D. Sauvage)
MC simulation (A.Kiryunin, D.Salihagic)
Result: Final definition of the setup
List of open questions and critical items
Realistic schedule
Possible scenario in the HEC testbeam system (H.Oberlack)
Possible scenario in other cryostats (D.Fournier)
FCAL modules and set-up (L.Shaver)
EMEC module and support (P.Karst)
HEC modules (H.Stenzel)
Overall workplan and possible schedule (FCAL community ?, L.Shaver)
MC studies (A.Kiryunin)
Result: Choice of primary option (if possible)
-- Testbeam and cold test programme:
** FCAL calibration in testbeam:
What does it consist of? when and how is it to be done?
How does it correlate to the combined run ?
(FCAL community ?, L.Shaver)
** EMEC testbeam and cold test programme
** HEC testbeam and cold test programme (H.Stenzel)
Excursion
HEC (Morley O'Neill)
EMEC (P. Karst)
FCAL (L.Shaver)
Cryostats (S.Prat, A.Fallou)
B180 integration (P.Fassnacht )
Result: List of unresolved points and critical elements<
-- LAR integration and access in ATLAS (V.Vuillemin, P.Fassnacht)
A first closer look at overall integration
What are open points?
What does a reasonable access look like for the end-caps?
-- Calibration:
Procedures for electronic calibration:
EMEC (?)
HEC (P. Strizenec)
FCAL (?)
Signal reconstruction
Where do we stand with the understanding of energy calibration?
--Specifics of signal reconstruction and calibration in
HEC (P.Strizenec)
EMEC ( ? )
FCAL ( L.Shaver )
--MC simulation in the end-cap and forward region
Status and future development
Status of GEANT4 (D.Salihagic, A.Kiryunin)
Status of ATLFAST (?)
Summary